Wet Joint

From perfect joint to hinge

By means of installation of continuity reinforcement bars, through columns and walls for beams and floors, after the completive casting, a perfect structural monolithism is obtained, completely analogous to the cast in place one, in particular with regard to the earthquake.


PLUS

  • Perfect monolithism with all the operational and quality advantages of a prefabricated structure.
  • It is always possible to realize the support even without continuity: for example beams hinged on cantilevers.


RESTRICTIONS

  • To get a strong optimization, in the case of the prefabricated column, the concrete of the completive casting should reach the strength of the prefabricated concrete but, if the joint is confined, it will be sufficient that the integrating casting has a resistance equal to two thirds of that of the column.


MOST SUITABLE COMPONENTS

Beams, Columns, Floor slabs, walls: all.

structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
nodo umido strutturale incastro perfettostructural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
structural wet joint - perfect joint
PERFECT JOINT
structural wet joint - hinge
structural wet joint - hinge
structural wet joint - hinge
structural wet joint - hinge
HINGE

COPYRIGHT © STERCHELEGROUP® - Credits > OTO Agency