Pavia and Voghera Prisons

Carceri di Pavia e Voghera

StercheleGroup® integrated solutions for Italian new jails building program. The assembly of these two prison pavilions was completed in a very short time (86 days for Pavia pavilion and 67 for the Voghera one) thanks to the simplicity and completeness of the structural systems of StercheleGroup®.

The system included: multi-storey prefabricated wet-joint columns, SD Prefabricated Composite Truss Beams with steel bottom plate, hollow-core slabs, sandwich prefabricated panels with thermal insulation complete with windows and steel grids and prefabricated concrete bathroom pods provided with a computerized management of quantity and temperature of sanitary water.

 
Pavia PV
Italy

COPYRIGHT © STERCHELEGROUP® - Credits > OTO Agency