The construction works of “Oliveto” building complex in Cagliari are proceeding. The building will have residential and commercial use and will be developed on 9 floors.
The construction system consists of PREM self-supporting reticular beams with a 10 cm bottom, prefabricated multi-storey concrete columns with structural wet joint and rectangular section, prefabricated tubular steel columns and a hollow-core slabs.
The use of the prefabricated system, properly designed for the construction of the peculiar overhangs of the building, reduces the deck weights and allows...